Updated weekly · Haslet, Texas
What's coming to Haslet, TX in 2027
We track 11 projects in and around Haslet: new stores, schools, roads, parks and more, each with its latest sourced date. Next up: Kroger Sendera Ranch, V.R. Eaton HS stadium & arena (Feb–Apr 2027), J. Fred Davis High School (Aug 2027 (2027-28 school year)).
Last checked Nov 16, 2026. Dates come from city records, state construction filings, company announcements and local news.
Where it's all going
Every tracked project with a known location. Tap a pin to open it.
Haslet at a glance
What's on the way, soonest first.
| Project | Type | Status | Expected |
|---|---|---|---|
| 1Kroger Sendera Ranch | Grocery & big-box | Opening soon | Before Thanksgiving 2026 (Kroger target) |
| 2V.R. Eaton HS stadium & arena | Schools | Under construction | Feb–Apr 2027 |
| 3J. Fred Davis High School | Schools | Under construction | Aug 2027 (2027-28 school year) |
| 4Avondale Haslet Road widening | Roads | Under construction | Winter 2028 |
| 5Sendera Ranch Blvd shops | Shopping | Under construction | Date TBD (first tenant build-out permitted) |
| 6BSW ER Champions Circle | Health care | Under construction | First half of 2027 |
| Northwest ISD Davis High rezoning | Schools | Approved | New zones start Aug 2027 (approved Nov. 9, 2026) |
| 7SH 170 spur to Intermodal Pkwy | Roads | Proposed | Date TBD |
| 8Fifth Third Sendera Ranch | Shopping | Proposed | Date TBD (building permit in city review) |
| 9Wells Fargo Sendera Ranch | Shopping | Proposed | Date TBD (grading permit in city review) |
| 10FM 156 widening, SH 114 to Intermodal | Roads | Proposed | Date TBD |
Opening soon 1
Firm or near-term opening dates.
Under construction 5
Being built now, soonest first.
- 2V.R. Eaton HS stadium & arenaFeb–Apr 2027Northwest ISD bond work at V.R. Eaton High School in Haslet adds a 7,500-seat stadium with parking and baseball/softball facilities (Feb 2027) and an arena (Apr 2027).
- 3J. Fred Davis High SchoolAug 2027 (2027-28 school year)Northwest ISD is building Davis High School, its fourth comprehensive high school, off North Riverside Drive near I-35W and SH 170 in north Fort Worth. It opens in…
- 4Avondale Haslet Road wideningWinter 2028Fort Worth is widening about 2 miles of Avondale Haslet Road from two to four lanes, from Willow Creek Dr. east to the city limit, with new signals…
- 5Sendera Ranch Blvd shopsDate TBD (first tenant build-out permitted)Two new shop buildings stand across Sendera Ranch Blvd. from the new Kroger Marketplace: 5,110 sq ft at 14901 and 10,500 sq ft at 14917 (Fort Worth city…
- 6BSW ER Champions CircleFirst half of 2027Baylor Scott & White Emergency Hospital – Alliance, at 2952 SH 114 across from Texas Motor Speedway, with eight ER beds and eight inpatient beds. Set to open…
Planned 1
Approved or announced, not yet under construction.
Proposed 4
Early ideas and studies. These may change or never happen.
- 7SH 170 spur to Intermodal PkwyDate TBDTxDOT plans a $115M SH 170 spur in AllianceTexas: a 1.4-mile elevated bridge from SH 170 east of I-35W to Intermodal Parkway, tied to Old Denton Road. Schematic…
- 8Fifth Third Sendera RanchDate TBD (building permit in city review)Fifth Third Bank has applied to build a branch of about 2,400 sq ft with a drive-thru at 14916 Sendera Ranch Blvd., on a lot beside the new…
- 9Wells Fargo Sendera RanchDate TBD (grading permit in city review)A Wells Fargo bank is planned at 1352 Rancho Canyon Way, on a lot beside the new Kroger Marketplace (Fort Worth city limits, Haslet address). A city grading…
- 10FM 156 widening, SH 114 to IntermodalDate TBDTxDOT is studying rebuilding FM 156 from two to four lanes (six ultimate) between SH 114 and north of Intermodal Pkwy, with bike/ped and intersection upgrades. Public meeting…
Opened in the last 12 months 2
Recently finished.
- Romer Elementary SchoolOpened Aug 2026Northwest ISD's new Leigh Anne Romer Elementary, along Wagon Train Trail in the Sendera Ranch area, welcomed its first students Aug. 12, 2026.
- MTU Maintenance at Alliance AirportOpened Jul 2026MTU Aero Engines opened its first U.S. engine maintenance facility at Perot Field Fort Worth Alliance Airport, a $120M+ investment expected to reach 1,200+ jobs. Foxlink's ~900-job plant…
Thinking about living in Haslet?
See how Haslet scores on schools, commute, cost and more, and compare it with nearby cities.
Questions about Haslet
What grocery stores are coming to Haslet?
On our tracker right now: Kroger Sendera Ranch (Before Thanksgiving 2026 (Kroger target)). Dates in brackets are the latest sourced timing for each store.
What is opening next in Haslet?
Kroger Sendera Ranch is the next dated opening we track in Haslet: Before Thanksgiving 2026 (Kroger target).
Are new schools being built in Haslet?
Yes. We are tracking: V.R. Eaton HS stadium & arena (Feb–Apr 2027); J. Fred Davis High School (Aug 2027 (2027-28 school year)); Northwest ISD Davis High rezoning (New zones start Aug 2027 (approved Nov. 9, 2026)).
What road projects are planned around Haslet?
Road work we are tracking: Avondale Haslet Road widening (Winter 2028).
How do you know these dates?
Every project page lists its sources: city records, state construction filings, company announcements and local news. When a company has not announced a date, we say so instead of guessing.
How often is this page updated?
It rebuilds itself from our project tracker. Projects close to opening are checked weekly and the whole list is re-checked every month.